August 2008

We took Ninkasi on a few weekend cruises with the Portsmouth Boat Club, but other than that, we’re still land bound. We did start the bath remodel, mostly planning. The problem with the plan was it kept getting bigger and more involved. First the project grew from just replacing the shower to add a new vanity, sink, countertop, tile floor , wainscot, and lighting.

Starting the work only increased the work involved. Undetected leaks behind the shower had rotted out studs and created additional work. Removing the existing linoleum floor exposed a rather large crack in the slab floor that required repair. In the meantime, the project acquired more territory and included the master bedroom and entry foyer.